Labor rates · May 2025 wage data

What home-service trades cost per hour, city by city

A quote is labor plus materials. These pages show the labor side for 20 trades in 393 metro areas: what the workers earn (from the U.S. Bureau of Labor Statistics) and what a company has to bill per hour to cover them, with every step of the math shown.

By trade (U.S. median)

TradeMedian wageBilled rate (our math)Metros
Plumbers$30.67$82 – $125388
Electricians$30.38$81 – $124390
Brick and block masons$29.87$80 – $122154
HVAC technicians$29.33$79 – $120389
Carpenters$29.12$78 – $119390
Drywall installers$28.33$76 – $116169
Glaziers (window and glass installers)$27.44$74 – $112161
Concrete finishers$27.41$73 – $112336
Flooring installers$27.15$73 – $11176
Tile setters$26.77$72 – $109125
Roofers$26.65$71 – $109265
Paving crews$25.64$69 – $105156
Tree trimmers$24.50$66 – $100144
Handymen (general repair workers)$23.84$64 – $97393
House painters$23.75$64 – $97361
Insulation installers$23.62$63 – $96112
Fence installers$23.07$62 – $9455
Pest control technicians$21.75$58 – $89245
Landscapers$18.82$50 – $77392
House cleaners$17.07$46 – $70392

5,093 trade-and-metro pages. Pick a trade to see every state and metro.

How we calculate the billed rate

1. The wage. The median hourly wage for the occupation in that metro area, from the U.S. Bureau of Labor Statistics' Occupational Employment and Wage Statistics (May 2025 estimates, the latest published). Half of the workers earn more, half less.

2. Employer cost. Wages are 70.0% of what private employers spend per hour worked; the other 30.0% is benefits, payroll taxes and insurance (BLS Employer Costs for Employee Compensation, June 2026). We divide the wage by 0.70.

3. Billed hours. A worker paid for 40 hours does not bill 40: there is driving, estimating, shop time and warranty callbacks. We assume 70% to 80% of paid hours are billed. This is our assumption, not BLS data.

4. Overhead and profit. Vehicles, tools, licensing, liability insurance, office and marketing, plus the owner's profit. We assume 50% to 100% on top of labor cost. Also our assumption.

The low end of the range uses 80% billed and 50% on top; the high end uses 70% billed and 100% on top. The result is a planning figure for the labor in a quote, not a price: a company's actual rate depends on its crew, its costs and the job, and materials, permits and minimum or trip charges come on top.

How we check the offers shown next to these numbers: our methodology.